Commissioning and upkeep from NC500 Installation Manual V1.2. Operating sequence: key ON → HMI self-test → parameters → START.
NC500 Installation
Run manual-mode tests for press plate, feed motion, and drag chain before automatic production.
← NC500 Installation & Commissioning Guide
Red stop, green start, touchscreen, and emergency stop are on the cantilever-mounted panel.

Complete no-load tests in manual mode before loading material.

Follow the interval table to keep feed accuracy and pneumatic reliability.
Request NC500 installation support