全部步骤完成后再撕除蓝色保护膜。
NC500 安装
共 14 步,从调平到最终外观检查。
Verify main unit, dust bin, pneumatic cylinder, covers, motor, leveling feet, and side panel after unboxing.

Level the host, mount the pneumatic cylinder, adjust three white press-plate screws, and connect cables/air lines.



Install control panel cantilever, bellows cover (green alignment marks), dust collection unit, and side panel.




Complete press plate/feed mechanism, internal adjustments, feed motor, ball screw/guides, final bolt check, and front appearance.






