Mechanical chapter from NN300-ICM-001: prepare the four stations before HMI dimension commissioning.
NN300 Installation
Critical dimensions: moulding 1–2 mm above fixture; magazine 2 mm above moulding; identical nail dies on all four stations.
← NN300 Installation & Commissioning Guide
Energise the XINJE touchscreen and enter the Automatic Screen before mechanical adjustments that require HMI reset.


Verify nail dies (4 sets), fixtures (4 sets), hex keys, sample moulding, and V-nails before starting.

Moulding must sit 1–2 mm above the fixture surface on every station.


Set magazine lower edge 2 mm above moulding top on all four cavity modules.

Confirm HMI changeover/maintenance mode before replacing dies. Load V-nails open-end inward, adhesive face up.