Power-on & HMI start-up
Energise the XINJE touchscreen and enter the Automatic Screen before mechanical adjustments that require HMI reset.
- Rotate key switch clockwise to ON; wait 10–30 s for HMI boot
- Tap Enter Main Interface on the welcome screen
- Confirm no unacknowledged alarms
Fig. 01 — Control panel
Fig. 02 — HMI welcome screenPacking list & tools
Verify nail dies (4 sets), fixtures (4 sets), hex keys, sample moulding, and V-nails before starting.
Fig. 03 — Accessories & toolsFixture replacement — four stations
Moulding must sit 1–2 mm above the fixture surface on every station.
- Loosen two mounting screws; remove fixture vertically
- Install correct fixture size; tighten diagonally
- Repeat for all four stations with consistent height
Fig. 04 — Loosen screws
Fig. 05 — Height reference (critical)Magazine height adjustment
Set magazine lower edge 2 mm above moulding top on all four cavity modules.
Fig. 06 — Magazine heightNail die replacement & V-nail loading
Confirm HMI changeover/maintenance mode before replacing dies. Load V-nails open-end inward, adhesive face up.
All four stations must use the same nail die size or nailing depth will vary.
Fig. 07 — Nail die
Fig. 08 — Changeover reset
Fig. 09 — V-nail loading