Final acceptance chapter from NN300-ICM-001. Inspect 3–5 consecutive pieces before full batch production.
NN300 Installation
Enable IO Monitor detections before the first start. Know the physical E-stop location during trial run.
← NN300 Installation & Commissioning Guide
Load one moulding display-face up for a single-piece trial before batch production.


Skip this section if the collector/conveyor option was not purchased.