Commissioning chapter from NN300-ICM-001. Press Set Length and Set Width after every value change or the mechanism will not move.
NN300 Installation
Target running clearance is approximately 0.5 mm. Adjust in 0.1 mm steps and re-confirm with Set Length / Set Width.
← NN300 Installation & Commissioning Guide
Open Parameter Adjustment or Length/Width Adjustment from the bottom navigation bar.


Place moulding display-face up. Slide left/right with light finger pressure — no binding, no excessive play.

On the Automatic Screen, set Distance (up to 10 rows) and Nail Count per row. Match Row 1 and Row 2 to physical nail exits.